|
|
 |
 |
|
 |
| |
Design & Operation of Large Waste Dumps
|
Tim Eaton MSc P.Eng and Scott Broughton
Published by EduMine
Training Time: 25 hours approximate SME Course Completion Certificate available
EduMine CEU Certification available upon request with minimum review score of 75%. 50 days access
2.5 CEU Online Delivery Upon purchase, you will be emailed access instructions and a receipt.
This product is available.
- Members: $321.00 USD
- Students: $321.00 USD
- Non-members: $378.00 USD
Your price:
$378.00
Members & Students may LOG IN to receive discounted pricing.

|
Mine waste rock and overburden dumps are massive structures. Mountain top coal mines in British Columbia are constructing the largest man-made structures on the face of the earth. These immense waste dumps are often up to 400 meters high, contain in excess of one billion cubic meters of material, and often form mid-valley fills or rock drains. Instability of the structures has caused increased concern by mine operators and government regulators because of risk to the safety of personnel, equipment and infrastructure, and their impact on the environment.
In mid-1990 representatives of industry, CANMET, and the Ministries of Environment, and Energy, Mines and Petroleum Resources formed the Mine Waste Rock Pile Research Committee to foster research work and ensure a common understanding of these waste dumps.
Design and Operation of Large Waste Dumps is based on three of the documents resulting from a series of studies directed at improving our understanding of behaviour and developing a consistent database for waste dumps: Investigation and Design Manual (1991), Operating and Monitoring Manual (1991) and Review and Evaluation of Failures (1992). Prominent geotechnical consultants and industry representatives have contributed their expertise to the studies.
The studies are being widely distributed by the Ministry of Energy, Mines And Petroleum Resources in the hope that all concerned with mine dumps will find them useful in establishing dumps that are stable, safe, and economically feasible.
Course Content The full course consists of 19 viewing sessions of 30-60 minutes each, plus supporting figures and tables and interactive reviews. Appendices include detailed reporting of dump failures and dump operating procedures in BC. Course duration is equivalent to approximately 25 hours of viewing content.
Technical Requirements- Internet Explorer browsers 8.0 or later
- Windows 7, XP, 2003, and 2000 operating systems
- 1024x768 display settings
- Flash Player v10.xx or later
- TURN OFF POP-UP BLOCKERS
Need help? Call 303-948-4222 or email eLearning@smenet.org
|
|
 |
 |
 |
|