hole completion Featured Items
Publication

Guideline for Drilling and Sampling in Embankment Dams (2014)

Damage created by hydraulic fracturing during the drilling process and/or unacceptable methods of completing borings can open seepage paths which could create conditions conducive to piping and ultimately dam failure. This document provides guidance agency policy on the Bureau of Reclamation’s (Reclamation) investigation in embankment dams, including investigation planning, site preparation, borehole advancement, subsurface testing, and borehole completion.

drilling sampling planning drill methods drill practices hole completion geotechnical investigation