Olympias Mine is operated by Hellas Gold S.A., a subsidiary of Eldorado Gold Corporation. The orebody shape and size are suitable for a drift and fill mining method. The mining sequence is overhand and the demand for backfill strengths are generally low except for the initial sill cuts. The design fill strengths are determined from the planned stope exposures to allow for safe extraction of the ore in adjacent drifts and immediately below the initial sill drifts with minimum dilution. Due to the permit constraints imposed on mining at Olympias Mine, after an environmental impact assessment, there is a requirement that the final backfill strength must reach a uniaxial compressive strength (UCS) of 4.0 MPa at 28-day cure age. By developing a suit of mix recipes incorporating superplasticiser admixtures, it was possible to achieve the strength demands and the workability of the backfill. This paper presents the results from comprehensive test work conducted on whole mill tailings and cyclone mill tailings to produce high strength backfill.
Mavres Petres mine is an underground mine, located in Chalkidiki, northern Greece, that is owned and operated by Hellas Gold; a wholly owned subsidiary of Eldorado Gold Corporation. The mine extracts a highgrade lead and zinc orebody using drift and fill mining method. Backfill is an integral part of mining cycle at Mavres Petres mine. Filtered coarse tailings mixed with cement are used for making cemented hydraulic backfill in a surface batching plant. The paper will discuss and present an overview of the backfill optimisation efforts at Mavres Petres mine, which includes recent changes and upgrades in the backfill plant, improved mix design, backfill quality control, and backfill delivery and placement in order to improve the operational efficiency, product consistency, safety and economic viability of the mine.