design intent Featured Items
Publication Event

Achieving the design intent, reducing risk and saving costs of tailings storage facilities, Paste 2021: 24th International Conference on Paste, Thickened and Filtered Tailings, Paste 2021

Planning, operating, monitoring and closing a tailings storage facility (TSF) can present many challenges, especially in dynamic mining environments where site conditions vary spatially and with time. However, big impacts can be made at relatively small cost once the tailings management system, design and performance are well defined and understood. This paper presents various examples of initiatives aimed at achieving the design intent that have been adopted by Rio Tinto Iron Ore, which also reduce risks and improve tailings management performance. Examples presented include development and communication of short-term, long-term and life-of-facility deposition plans, implementation of simple deposition management tools, monitoring and managing slurry density, development and continual oversight of water balance models, and sound investment in water management infrastructure extending to safe performance in emergency situations. Regular governance was also implemented to provide assurance that these controls remain effective.

tailings management design intent deposition water balance decant