shotcrete Featured Items
Publication Event

A comparison of cemented paste backfill shotcrete barricade design methods, Paste 2021: 24th International Conference on Paste, Thickened and Filtered Tailings, Paste 2021

The use of cemented paste backfill (CPB) is becoming increasingly more common at underground mines worldwide. Part of any CPB design includes the specification of the (typically) shotcrete barricades that retain the CPB within the stope during filling. Newmont’s Tanami Operations (NTO) has started an in situ barricade stress monitoring program. The data from this program will provide a basis for comparison of several models that can be used to model the capacity of these barricades. These models vary in complexity from analytical solutions to 3D numerical models. Part of the comparison will include a discussion detailing the required material inputs and how these inputs were obtained. Analysis of this comparison will provide additional understanding on what parameters affect the ultimate capacity of a shotcrete barricade.

backfill barricade shotcrete instrumentation modelling
Publication Event

Optimisation of backfill operations at Mavres Petres mine, Paste 2021: 24th International Conference on Paste, Thickened and Filtered Tailings, Paste 2021

Mavres Petres mine is an underground mine, located in Chalkidiki, northern Greece, that is owned and operated by Hellas Gold; a wholly owned subsidiary of Eldorado Gold Corporation. The mine extracts a highgrade lead and zinc orebody using drift and fill mining method. Backfill is an integral part of mining cycle at Mavres Petres mine. Filtered coarse tailings mixed with cement are used for making cemented hydraulic backfill in a surface batching plant. The paper will discuss and present an overview of the backfill optimisation efforts at Mavres Petres mine, which includes recent changes and upgrades in the backfill plant, improved mix design, backfill quality control, and backfill delivery and placement in order to improve the operational efficiency, product consistency, safety and economic viability of the mine.

hydraulic backfill coarse tailings mix design arched shotcrete barricades backfill pre-support QAQC test work uniaxial compressive strength
Publication Event

Paste backfill continuous pour: Red Lake operations case study, Paste 2021: 24th International Conference on Paste, Thickened and Filtered Tailings, Paste 2021

Cemented paste backfill (CPB) has become known as a superior secondary ground support technique and mine tailings storage method for stoping. Extensive scientific research has been conducted by the authors on CPB to provide the Red Lake operation (RLO) of Evolution Mining with an optimised backfill placement process. Due to these complex factors and interactions, a rational CPB material design process was assessed to demonstrate the safety aspects related to a continuous pour. For this purpose, an extensive field monitoring program was required to quantify the CPB performance and characteristics. There are two different ways of optimising the CPB design to maximise placement rate: (i) optimising the type and amount of binder added to the system, and (ii) optimising the CPB placement process underground. Optimisation of binder type and dosage is relatively easy as the required backfill stand-up strength is based on block dimensions, stope stability, and extraction sequencing. Four stopes were instrumented with total earth pressure cells (TEPCs) and piezometers to capture the pressures acting on the fill fence structures and the strengthening response of the CPB plug within the stopes. This paper summarises the results of each of the tests performed. Based on the results obtained from this study, it was concluded that RLO can safely conduct continuous CPB pours with appropriate safeguards and protocols in place. It is important to note that this paper is a summary of the CPB performance and characteristics in RLO longhole stopes and does not reflect site-specific safety procedures, protocols, and critical controls required for a more aggressive pouring regime.

cemented paste backfill instrumentation total pressures continuous pour shotcrete fill fence